Public Meetings

1st Valley Infill EPPP Public Meeting 8-2-23

2nd Valley Infill EPPP Public Meeting 9-21-23

Valley Inflll Application

Valley Infill Application Documents

December 2022

Seneca Meadows Valley Infill NYSDEC Draft Scoping Document Cover Letter

Seneca Meadows Valley Infill NYSDEC Draft Scoping Document

2023

1st Community Meeting Regarding Seneca Meadows SMI Valley Infill Permit Application

Proposed SMI Valley Infill Permit Application Fact Sheet

Appendix A – Administrative Information

Appendix B – Part 360 Engineering Permit Drawings

Appendix C – Preliminary SWPPP and Drainage Reports

Appendix D – Hydrogeologic Investigation Report

Appendix D-6 – Laboratory Analytical Data Packages

Appendix E – Facility Manual

Appendix F – CQA – CQC Plan

Appendix G – Supporting Documentation

Appendix H – Design Calculations

Gas Collection Control System – Design Plan Modification

Response to Comments 1 – Compiled_ltr.041621.Merchant.Infill Response to Comments FINAL

Response to Comments 2 – ltr.080522.Merchant SMI Valley Infill Response to Comments

Response to Comments 3 – ltr-Merchant 2023-03-23 SMI NOIA Response to Comments

SMI Valley Infill – 6NYCRR Part 363 Engineering Design Report

Proposed-SMI-Valley-Infill-Permit-Application-Fact-Sheet.pdf

Title V Permit Modification Documents

SMI Valley Infill – Public Participation Plan

August 2023

2nd Community Meeting Regarding Seneca Meadows SME Infill Valley Infill Permit Application

November 15 2023

Responses to Comments Received to Date on the Permit Renewal and Modification Application

March 2024

SMI Valley Infill EJ PPP – March 2024 Progress Report

April 10 2024

SMI Valley Infill – Final Scoping Document – Cover Letter

SMI Valley Infill – Final Scoping Document